RS-25 flight engine E2063 is delivered and lifted into place onto the A-1 Test Stand at Stennis Space Center on Sept. 27 in preparation for an Oct. 19 hotfire test.
Źródło: ‘Two For the Show’ – NASA Installs 2nd RS-25 Flight Engine for Testing
RS-25 flight engine E2063 is delivered and lifted into place onto the A-1 Test Stand at Stennis Space Center on Sept. 27 in preparation for an Oct. 19 hotfire test.
Źródło: ‘Two For the Show’ – NASA Installs 2nd RS-25 Flight Engine for Testing
No one has commented yet.
You must be logged in to post a comment.
Comments
Leave a comment